uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (6057)

closed #204793

Potholes, Other Street Repair

3775 E Regents CT

Case Date:
8/8/2025

This is a man-made hole on Regents Court. They are throughout the St James Woods neighborhood off Moores Pike. Most have some cover. This one does not. It is a hazard for people who walk. Thanks.

closed #204809

Potholes, Other Street Repair

Case Date:
8/9/2025

on North Jackson Street, just north of 9th Street, at entrance to Rev Butler Park, there is an extensive pothole --- and others as you travel north to BLIne crossing.

closed #204853

Potholes, Other Street Repair

1906 S Walnut St

Case Date:
8/11/2025

In the southbound, left lane. Not sure if it’s a pothole or grade difference in the road but it’s going to blow my tire. It’s hard to see so I hit almost every time.

closed #204810

Potholes, Other Street Repair

Case Date:
8/9/2025

Thank you for repaving of Sixth Street from Rogers to Elm Street. But, the worst part of that street is from Elm to just beyond the roundabout at Oak Street......it is in horrible condition for cars, bicycles or pedestrians. The street truly needs repaving all the way to Adams, but at least get to Oak Street. Thank you

closed #204897

Potholes, Other Street Repair

1022 N College AVE

Case Date:
8/13/2025

2 or 3 pretty big potholes on the block of 15th between Walnut and College

closed #204729

Potholes, Other Street Repair

300 W Brookdale DR

Case Date:
8/6/2025

Over a year ago, new water lines were installed along Brookdale to accommodate a new apartment complex on the west side of Kinser Pike. (Aspen Apts.) That construction dug up parts of the yards of the houses on Brookdale as well as part of the street itself. The street was never repaved and the areas that were covered up with dirt become muddy when it rains.

closed #204830

Potholes, Other Street Repair

917 E Grimes LN

Case Date:
8/11/2025

Previously reported this hole. Took 6 or more weeks for someone to repair. Put asphalt on top which lasted almost 2 weeks before opening up again. 15" hole needs FILLED with dirt/gravel before asphalt