closed #203999
Potholes, Other Street Repair
- Case Date:
- 7/6/2025
A large POTHOLE on N. Kinser Pike (at corner of Maroon Way, to Bloomington North) was recently repaired (2-3 weeks ago) but has recurred. It would appear that the asphalt was TOO SOFT at the time of allowing the cars to resume traffic over the repair site and so the asphalt collapsed and we now have resumption of the pothole. This pothole still needs a satisfactory repair please.