Potholes, Other Street Repair
- Case Date:
- 5/16/2022
The alley next to my house needs to be graded (my car scrapes the middle/high section of the alley).
You already did the section that is off of Highland Avenue (thank you!), but the part of the alley that connects to Ballantine Road needs to be done. It starts at the alley entrance from Ballantine Road (503 S. Ballantine Rd) and goes about halfway down the alley. In this area, the middle of the alley needs to be scraped down and gravel added.
It would be great if you could add gravel to the whole alley as some sections are muddy after a rain.
Thank you.
Potholes, Other Street Repair
- Case Date:
- 5/17/2022
Pothole at the intersection of Morton and 6th Street.
Potholes, Other Street Repair
- Case Date:
- 5/20/2022
Smith Road needs a bit of patching in bits Northbound between Morningside and Grandview. It actually looks in need of a new entire overlay, but I'm not sure how frequent that happens. It gets a ton of traffic last few years it seems.
Potholes, Other Street Repair
- Case Date:
- 5/21/2022
Intersection of smith Rd and Stonegate Dr. Large amount of broken glass as you turn in to Stonegate Dr. This impacts walking and driving path. Can’t be seen in dark but can In sunlight. .
Potholes, Other Street Repair
- Case Date:
- 5/22/2022
The issue from case #179307 has already returned from the recent storms.
Potholes, Other Street Repair
- Case Date:
- 5/24/2022
Sunken manhole cover, at the intersection of E Second and College Mall Rd, between Wendy's and the gas station.
Potholes, Other Street Repair
- Case Date:
- 5/25/2022
There is a large pothole in the entrance to the paved alley behind 423 S. Eagleson Ave (directly across the street from 1410 E Hunter)
Potholes, Other Street Repair
- Case Date:
- 5/29/2022
Potholes on E First at the speed bumps in front of #1852 and #2028 (the new house).
Continuing towards Sheridan, pothole near the YIELD sign on the right hand side after the last speed bump on E First before it becomes Sheridan.
This is (closed?) case #178726 (Febr. 1, 2022) and #179389 March 29, 2022).
Continuing on E First towards Highland, several more potholes on the south side of the road starting at the intersection with Eagleson.
Potholes, Other Street Repair
- Case Date:
- 5/29/2022
Pothole in the pedestrian crossing at S Adams and Patterson
Potholes, Other Street Repair
- Case Date:
- 5/30/2022
The grass and weeds have grown very tall on this city-owned land bordering the ditch that runs along Davis Street. Sometimes neighbors will mow this strip but no one is doing it this summer. Please send out the city mowers to cut down this too-long growth. Thank you.