closed #202754
Potholes, Other Street Repair
W 6th St
- Case Date:
- 5/17/2025
West 6st at Oak, torn up surfaces.
West 6st at Oak, torn up surfaces.
When biking south on Rogers and turning right (west) onto 6th street, the road is so torn up that it's impossible to safely turn onto 6th without making a wide turn and coming to an almost complete stop. Both of which are very unsafe given how fast cars drive behind me.
Several potholes in front of Bloomingfood's.
Left turn light does not go green.
The street repair is done but workers left street closed signs at both ends
The NE corner of 7th & Waldron at the street level was torn up MONTHS ago during the Near Westside sidewalk and ramp work. This corner has never been either completed or the pavement restored. When will this finally be finished? I see this as an issue as we go into the rainy winter, where this area will be more prone to icing, which will create a potential road hazard.
Small pothole right before Hay Street
There is a large pothole that needs patched on Jonathan Drive just east of the intersection with Gates.
It gets bigger every day, it seems
Massive pothole ~20 yards east of Gates Dr on Alexander Drive between Lowe’s and Bed, Bath, & Beyond