Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 11/7/2023
Street repaving request for East Longview Ave.
Looking for the 2024 paving schedule, may not be released yet.
East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish:
-Repaving needed overall
- Install updated traffic calming bump design replacing current full width bumps.
-Stripe the bike path lane stripe as it's part of the E-W bike greenway.
And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park.
We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.
Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 12/4/2023
Hello Joe and Street Dept. staff. We sure appreciate you adding the new strips to the speed bumps on E. Longview Ave. Unfortunately one and maybe a second have come unglued. Sorry to see it and wanted to inform you ASAP. Thanks again for the action!
Steve Akers
Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 6/18/2025
Yellow "CBS" work safety coat lost and now hanging to be claimed on road construction sign by my home. 3449 E. Longview Ave. "Chambers" name is written on the back of the coat. Please retrieve. Not sure if it is a COB staff person's or one of the Greenway contractors. I told one of the contractor staff today where the coat is hanging but it was not retrieved.
Potholes, Other Street Repair
3444 S Ashwood DR
- Case Date:
- 8/30/2023
This is a very risky situation. Someone could get hurt here. Please take a look.
Potholes, Other Street Repair
3442 N Stoneycrest RD
- Case Date:
- 7/10/2025
There is a pothole in the road at the end of this property’s driveway.
Potholes, Other Street Repair
3441 S Burks CT
- Case Date:
- 11/21/2020
deep pothole on south Walnut Street Pike north of E. Heather Drive in southbound lane approximately at second condo on east side of street.
Potholes, Other Street Repair
344-500 South Cory Lane
- Case Date:
- 3/15/2015
Large pothole
Potholes, Other Street Repair
344 S Rogers ST
- Case Date:
- 3/12/2024
Southbound on Rogers St before you get to Smith Ave, there's a pothole. Thanks!
Potholes, Other Street Repair
344 S Dunn ST
- Case Date:
- 9/23/2024
Potholes on Dunn between turn off of Atwater and intersection of Smith
Potholes, Other Street Repair
3436 E Homestead DR
- Case Date:
- 7/19/2016
Large pothole/damage to the street occurred something in the past 17 days (we were out of town starting 1 June and it wasn't there when we left). Someone did something that seems to have ripped up two layers of pavement.
This pothole has the additional feature of being right at the end of our angled driveway, so now it's much harder to avoid scrapping the bottom of the car when pulling in and out. So even a short term quick fix would be appreciated if possible.
Thanks,
Carrick Rogers