uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (5947)

closed #167031

Potholes, Other Street Repair

252-298 S Franklin Rd, Bloomington, Indiana, 47404

Case Date:
1/9/2019

The south edge of an intersection has a dangerous amount of multi-level road surface damage.

closed #164614

Potholes, Other Street Repair

2521 E 2nd ST

Case Date:
5/31/2018

I'm a resident at Ambassador Apartments, and these potholes (4 major ones) are always on my way to the bus, dumpster, and sidewalk. I'm blind, and I cannot notice these while I'm walking, and I've fallen on them many times. I've lived here since 2011, and these potholes have existed since that time without being repaired.

closed #199272

Potholes, Other Street Repair

2524 E Eastgate LN

Case Date:
11/8/2024

Potholes along road

closed #167347

Potholes, Other Street Repair

2525 E Rock Creek DR

Case Date:
2/7/2019

The storm drain at the NW corner of E. Rock Creek Dr. and S. Belhaven Ct. is completely silted and non-functional.

closed #164827

Potholes, Other Street Repair

2528 Cota Drive

Case Date:
6/14/2018

Pothole in new asphalt on Cota drive, with all the rain there is a low spot that is washing out in the middle of the road

closed #165101

Potholes, Other Street Repair

253 East Davis Street

Case Date:
7/10/2018

there is a hole in the pavement in the middle of west bound lane of Davis street. This hole has gotten deeper over time. It is roughly 12" in diameter.

closed #131546

Potholes, Other Street Repair

253-299 North Lincoln Street

Case Date:
4/30/2013

Pothole on 7th Street near the entrance to the First Presbyterian Church parking lot.

open #203525

Potholes, Other Street Repair

2532 N Skyline DR

Case Date:
6/18/2025

I live in Northwood Estates and travel daily on Kinser Pike from the bypass just to get home. After living here for 22 years, the amount of traffic has increased tremendously, especially BIG trucks. For the past 2 weeks, barrels, tape, etc have been placed there, restricting northbound turning in the left lane separately. What are the specific plans for the development and completion of this project? PLEASE complete this project before school resumes at Arlington and Bloomington High School North because in 1 afternoon I counted 28 buses going Southbound to the bypass. In advance, thank you for replying.

closed #187888

Potholes, Other Street Repair

2533 E Eastgate LN

Case Date:
4/4/2024

On the Bypass, just after the railroad tracks. Thank you!

closed #200605

Potholes, Other Street Repair

2533 E Eastgate LN

Case Date:
1/29/2025

Pot holes