closed #202179
Potholes, Other Street Repair
1211 S Grant ST
- Case Date:
- 4/21/2025
Hole made in street at easement to our driveway during cable work. This patch fell through. And hole if open. Picture won’t attach.
Hole made in street at easement to our driveway during cable work. This patch fell through. And hole if open. Picture won’t attach.
Uncovered borehole at the edge of the road. See the picture.
Potholes/pavement disintegrating on Browning Lane at both the corners of Allendale and Browning Place. At Allendale it is remaining damage from the fiber optic digging where they had to go into the street and it and is filled with mud and water most of the time. Right now it is dry(ish!). Browning Place has been a longer term erosion. Thank you!!!
See case #201442 (https://bloomington.in.gov/crm/tickets/view?ticket_id=201442). Given that the fiber optic project is now "on hold" (= bankrupt?), can the City step in and correct some of the damage they caused? They drilled a hole in the SW part of the intersection of Dunn/12th. It is dangerous, since there are no sidewalks on Dunn and lots of people wander through this area at night on their way to and from The Standard" via the RR. Someone is going to get hurt if the hole is not filled soon or an animal might fall in, and since there appears to be a void beneath the street right at this location, a collapse could occur if a heavy vehicle were to drive directly over it.
There is a pothole at the entrance by the sidewalk. The hole was made when the fiber wires were installed back in November. Never fixed. Vehicles scrap when they drove through it.
There's a hole in the road next to the sidewalk, just South of the intersection of Lincoln & Wilson Streets, on the West side of the street. It's been there since the crew was installing cable a couple of months ago. It's a hazard!
The GigabiteNow crews have been drilling round holes about 9 inches in diameter in many streets in town. I've especially noticed it on W 8th and W 6th Streets because I travel those streets daily on my bicycle, but they are on other streets, too. They have not been filling these holes properly and the holes are becoming a hazard for bicycles. They should be require to go back and properly fill those holes so that they leave the surface smooth with no craters or bumps.
Taylor or Young or both trucking is hauling dirt to the quarry behind the motels on Rd46 and as they leave the road they are making a mess and not cleaning it up. Part of the road was recently repaved because of them and now they need to clean up the road all the time not just when they feel like it. I keep my cars clean and I should not have to drive though dirt and mud to leave my house.
I have previously submitted uReport on this. Definitely appears to be a sinkhole. Much deeper and cone can fully sit inside. The road under appears caving in. I have more pictures if needed. I can only attach one.
Construction site workers have removed a portion of the dumpster enclosure on the alley, sitting at the NW corner of 325 E. 10th property parking lot. This left a dangerous 6" square hole where a support post had previous been. Not clear if the hole is on private property or in the alley, but it is dangerous now for people or small animals.