open #189108
Potholes, Other Street Repair
2101 S Bent Tree DR
- Case Date:
- 6/25/2024
Sidewalk is half covered by dirt/weeds inhibiting pedestrian access to sidewalk.
Sidewalk is half covered by dirt/weeds inhibiting pedestrian access to sidewalk.
When the curb between the bike lane and car lane was reconstructed gaps were left in the pavement. Generally the pavement repair was not done to the standard usually expected of Bloomington roads.
Can the city put some pressure on INDOT to open some lanes on 3rd and 2nd bridges? We have gridlock daily. Or maybe station cops to direct traffic? Or both? It's really out of hand and I rarely see anyone doing any work!
Please place deer crossing signs on North Range Road. A screenshot of suggested locations on either end of the median is attached. While walking my dog last night, I saw a car driving around the bend way too fast, hit a deer, and just drove off. The deer has a badly broken back leg, but unfortunately hobbled back into the woods by the IU cross country course before I could get to him/her. Especially with the construction going on with the new hospital, animals are being displaced and showing up around our apartment. Please place signs warning drivers of deer that may be crossing. I am willing to donate money for this if needed so contact me. Thank you.
The brick street on Park Avenue, in between 8th and 9th Streets, was torn up by the construction crews when they built the new Fiji house. They completed the work a while ago, but the street is still in awful shape. There are ruts everywhere, and a huge hole just south of 9th street. The bricks need to be replaced on this whole block.
With traffic that would normally be routing through Range Rd. now routing through the bypass, the dirt/gravel road (and large sections of Range road) are riddled with massive potholes.
The curb cut on the SW corner of 9th and Walnut is in bad disrepair. Impassable for anyone in a wheelchair and also very dangerous for everyone. It's been this way for several months now.
Dear City of Bloomington, This is not a complaint, rather a thank you. Thank you for completing the Old 37 Curve Correction project so quickly and for doing a great job. I wish that the I-69 project were so efficient. Sincerely, Troy Byler
The third street overpass over 37 needs to be shut down. It will collapse if urgent precautions is not taken immediately.
When does the city intend on finishing this section of road? Ever since the bridge was completed it doesn't look like any work has been done at all to finish this one bit of road at all, and it's been months! East-West traffic is already a nightmare for this county because of the construction on I-69, Second, and Third Street, and yet the one route that can really act as a good alternate route to help alleviate some of that traffic is hampered by this abandoned project. While the detours tell people to go down towards 11th Street, we all know that way too many people are cutting through the neighborhood where there are plenty of children trying to play outside. This is nothing but ridiculous!