Potholes, Other Street Repair
517 S Lincoln ST
- Case Date:
- 9/16/2025
Road has gotten extremely deep potholes over the past year and residents are worried that during the winter cars will slide down onto the main road. Last winter potholes were not as deep and cars still slid into the main road almost causing collisions multiple times. this is the only exit for many houses as it is a one way road.
Potholes, Other Street Repair
4101 E 3rd ST
- Case Date:
- 9/15/2025
broken glass from car wrecks in the bike path needs cleaned up, major safety issue
Potholes, Other Street Repair
- Case Date:
- 9/12/2025
Broken glass pieces all over on 6th Street just west of College Ave by Graham Plaza building and Social Cantina.
Potholes, Other Street Repair
200 E Glendora DR
- Case Date:
- 9/12/2025
The large sunken patch has asphalt edges that are starting to breakdown. The southbound edge is particularly bad now and the edge hits tires hard as it is crossed and speed limit. I drive this daily so I have noticed the decline. The whole big pay h needs final paving ASAP.
Potholes, Other Street Repair
1411 N Jordan Ave
- Case Date:
- 9/11/2025
Our sidewalks were updated over the summer. However, the curbs were not repainted, so we have cars parked to the very edge of our driveways and in bus zones. I am terrified to pull out of my driveway every day, because it's impossible to see the road. And, just this afternoon, one of my students pulled out and got into a terrible accident. So please repaint the sidewalks to prevent more accidents.
Potholes, Other Street Repair
1400 N David Baker AVE
- Case Date:
- 9/10/2025
There is a large rock, probably 3 foot by 3 foot in the roadway by the sidewalk. Could not roll it into the grass, too heavy
Potholes, Other Street Repair
Huntington & Hillside
- Case Date:
- 9/9/2025
Very large pothole on Huntington near Hillside. Any cyclist running over it will likely result in falls and injuries.
Potholes, Other Street Repair
1808 E Windsor DR
- Case Date:
- 9/9/2025
Road construction signs have been here for months. No construction is happening. I received a response to my previous report that, "This project is not yet completed. The signs will be removed upon completion."
Whatever project this is has also not begun. The signs need to be removed until the project is actually ready to commence. Posting signs months in advance is irresponsible. When and if this mystery project ever starts, crews will be at higher risk because of the street division's poor planning. Everyone in this neighborhood is used to those signs being there for no reason, so they are useless as a safety measure.
Potholes, Other Street Repair
W 1st St
- Case Date:
- 9/8/2025
Potholes on W. 1st and Wylie/Euclid from big trucks/heavy traffic in demolition work past few years. Right by parking lot for rental houses.
Potholes, Other Street Repair
1808 E Windsor DR
- Case Date:
- 9/5/2025
Signs indicating that road construction is ahead have been here for months. No construction is taking place. These signs need to be removed. Leaving unnecessary warning signs up is irresponsible since it conditions people to ignore them.