open #207101
Potholes, Other Street Repair
1121 S Henderson ST
- Case Date:
- 12/8/2025
repairs on grimes here are poorly done and rougher than the potholes they filled
repairs on grimes here are poorly done and rougher than the potholes they filled
Go to the intersection of Woodlawn and Grimes. Then, head north maybe 20 to 40 feet, and look at the western edge of the road. A large hole has opened up creating danger for cyclists and vehicles. This could use some patch work.
This hole STILL 4" deep. I reported it back on 8/11/25 work request # 204832. It's ridiculous it's taking so long to repair it properly. If it's not repaired before next Wed. I'm notifying the Mayor's office & City Council.
Hole on grimes, east at intersection
Hole on grimes at walnut intersection
Intersection S Stull Ave & E Grimes Ln 15" deep hole.
Previously reported this hole. Took 6 or more weeks for someone to repair. Put asphalt on top which lasted almost 2 weeks before opening up again. 15" hole needs FILLED with dirt/gravel before asphalt
Pothole near storage drain in sidewalk entering business
Asphalt in front of our driveway has completely washed away and there is a big pothole