closed #173256
Traffic Related Complaints
2424 S Bryan ST
- Case Date:
- 8/4/2020
Mr. McClelland reported that a city buss pulled out of Tulip Tree Apartments without stopping for the stop sign causing him to have to brake suddenly. The incident happen around 3:00pm today and he was able to get the plate number of the bus(#65289) This was a dangerous situation. Mr. McClelland would like a call back from a supervisor so he can discuss this matter further.
Wreckless driver of a Black Ferrari lost control, veered off road, and took out a tree and the Roundhill Ct. street sign. Police notified. Sign needs replaced.
The light at 3rd and Wynnedale creates major traffic problems, bringing all of 3rd street to a standstill constantly. I have seen near misses constantly of people impatiently cutting off each other or stopping in the middle of intersections. The light needs to be fixed to facilitate the flow of traffic safely.
Suggesting that a speed hump be put on E. Eastgate Lane, in between N. Hillsdale Dr. and the bypass. Cars fly through our street to and from the bypass, and there is a blind corner at Hillsdale and Eastgate.
The street signs at Clover Terrace/Cascades Drive have been knocked off their pole and are lying in a ditch at the foot of the pole
Street signs (W Clover Ter/N Cascades Dr) are missing. Pole still there.
Mr. Osbourne says he has contacted Transit 3-4 times to complain city buses are not stopping at stop sign behind Wal-Mart. Transit has told him they will talk to the drivers, but he says nothing has changed. Today, he said bus #9724, route 3E ran through this stop sign.
The construction plan and closures are ridiculous. We get no notice of any road closures and we now have one way in and out of our apartment complex, which leads to a congested one lane road. We received no notice of any road closures which included our side of 45/46 and Pete Ellis. How am I supposed to get to work on time when you change the roads and lights during rush hour traffic which causes major traffic jams. The overall thought and planning put into all road construction in Bloomington is abysmal. If giving notice of road closures is too difficult to do then try to focus on completing the construction on one road before starting construction on another.
Observed today at 1030 hrs. Eastbound vehicle making a U turn after the Overhill traffic island to turn onto Overhill. Traffic was not heavy but this could have impacted 3 lanes of traffic. FYI.