City Construction Projects
3625 E Morningside DR
- Case Date:
- 2/26/2019
the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.
City Construction Projects
723 W Allen ST
- Case Date:
- 3/29/2025
Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown
City Construction Projects
3549 N Hackberry ST
- Case Date:
- 5/18/2025
Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.
City Construction Projects
Heather Dr. front entrance to Peppergrass north side of street.
- Case Date:
- 9/16/2025
There are 2 holes located in the grass area between the sidewalk and Heather on the north side of the street. I would like them to be filled in for safety. Both are before you get to Laurel Ct.
Thank you,
Kaye Beavers, Peppergrass HOA, landscaping
City Construction Projects
1300 N Lincoln ST
- Case Date:
- 9/20/2025
I’m not sure what the rules of construction activity that is permissible, but I would assume that blocking private driveways and working in a residential neighborhood at 3AM is not allowed. My son and his roommates are seeing construction workers using their private yard to eat lunch and even order food to their address. This is absolutely unacceptable and do not believe it’s allowed by law to work a construction site, pouring concrete, etc. in the middle of the night in a residential neighborhood.
City Construction Projects
1355 N Lincoln ST
- Case Date:
- 9/20/2025
Construction continues to obstruct private driveway of my son’s rental. They are placing cones and blockades well onto their private drive. Additionally they are pouring concrete and making noise at 3-4 AM waking residents and renters. Not acceptable!!!!!
City Construction Projects
1316 N Lincoln ST
- Case Date:
- 9/20/2025
Late construction in the middle of the week. Sometimes between the hours 12am-5am.
City Construction Projects
- Case Date:
- 10/1/2025
The current construction project on 2nd street is extremely disruptive and causes the building to shake. For necessary/emergency daytime construction this is totally understandable, but the project on 2nd st (between Walnut/Rogers) has been doing construction only from late evening to overnight around 4-5am every day. I have not slept since the construction started a week ago and it is scheduled to continue another full week. Even if there is a permit to be exempt from the noise ordinance, please consider rescheduling this work to take place during daytime hours. As I said, the deeper digging affects the foundation of the building, causing very irritating vibrations that give me headaches and make sleep impossible. It has affected my work life and mental health to miss so much sleep. My window faces the road and this has been an absolute nightmare of a time for me.