City Construction Projects
3625 E Morningside DR
- Case Date:
- 2/26/2019
the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.
City Construction Projects
723 W Allen ST
- Case Date:
- 3/29/2025
Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown
City Construction Projects
- Case Date:
- 5/2/2025
Construction equipment is parked on the sidewalk. The city would not let businesses park this equipment on the street, blocking access for cars. Why do you allow them to block access for pedestrians? Thank you.
West 2nd street just east of eucild street northwest of street
City Construction Projects
100-198 E Smith Ave
- Case Date:
- 8/31/2012
It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.
City Construction Projects
- Case Date:
- 10/16/2012
i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
- Case Date:
- 8/27/2013
Road construction project on South Rogers St. Particular address 2018 S. Rogers. My elderly aunt (85 yrs old) lives at the back of this driveway. For the second time this summer I have had to complain about her driveway being inaccessible. We can park on the street to visit, but because of her physical condition she cannot walk to the street to our cars. Last Wednesday concrete was poured, a family member talked to someone on the construction crew and was told it couldn't be driven on until Monday. This is Tuesday and the driveway is still inaccessable! How many days is a person expected to stay in their home because of this? I called the Public Works number earlier this summer, unfortunately I don't recall the date, but it was on a Friday and I asked to speak to the person in charge of this project, I was given Justin Wykoff's voice mail. He never returned my call. I called 339-1444 after normal work hours and they also tried to give me Justin's name but I said he never returned my call and it was urgent that we get this driveway accessible so she could leave her home. I was given the Contractor's phone number, I left a message for him, didn't receive a call back so I called him again around 8:30 that evening and he said he would get it fixed on Saturday. It was fixed by 10:30 Saturday morning. I never heard anything from Justin. I called Justin Wykoff again this afternoon and left a message, I have not received a call back. I went by there this evening at 5:30 and took pictures which I am attaching to show the current state of the driveway. We need to get her out of the house, she's elderly but that doesn't mean she should be trapped in her house. It should be a common courtesy if nothing else for Justin to return my call and at least tell me when we can get in her driveway. Would it be better if I just contact the newspaper next time and let them know that city employees and the contractors the city does business with does not care about our elderly citizens being stuck in their homes for more than 7 days because of this construction project? I'm sure there are other elderly people living in the midst of this construction but their homes may be closer to the street or they may not have someone to complain for them. I'm not sure what can be done to avoid this situation during the remainder of this construction, but I think every option should be considered beforehand for the elderly or handicapped citizens. I would like for Justin Wykoff to call me at the above number and explain to me what the delay is in gettin this driveway open and why he has not returned my calls. He could have at least followed up with me on the first complaint to make sure it was resolved.
City Construction Projects
S ADAMS ST
- Case Date:
- 11/7/1996
STREET CAVING IN WHERE WORK WAS DONE
City Construction Projects
700 S Walnut ST
- Case Date:
- 9/9/1996
Ms. Borhan said the City tore up her driveway approximately a year ago and promised to return landscaping and everything back to "as was". She has not had any landscaping done and there is mud at the driveway.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/12/1996
Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.