City Construction Projects
524 S Lincoln ST
- Case Date:
- 6/10/1997
Citizen says construction crew was jackhammering street at 8am at Lincoln & University, a few feet away from her (and other) car. Dust and chunks of asphalt are all over her car. She thinks that no parking signs should have been posted if they were going to work this close to cars. Street Dept. thinks this was an Indiana Gas crew.
City Construction Projects
519 S Village CT
- Case Date:
- 9/8/2024
3 chickens running wild, maybe more. They are in all of our flower beds digging mulch, tearing up plants. Also they are creating flys everywhere which leads to maggots in trash cans. Someone has to do something please.
City Construction Projects
512 E University ST
- Case Date:
- 12/27/2024
Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in people front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from
City Construction Projects
507 E Kirkwood AVE
- Case Date:
- 9/10/2020
Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.
City Construction Projects
502 N INDIANA AVE
- Case Date:
- 8/1/1995
WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.
City Construction Projects
501 N Morton ST
- Case Date:
- 2/21/2019
There is several huge Pot Holes that need to be repaired close to 1005 N Jordan Ave. My daughter got a Flat Tire last night after hitting one.
City Construction Projects
501 E 7th ST
- Case Date:
- 7/14/1997
Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.
City Construction Projects
500-520 S Walnut St
- Case Date:
- 4/18/2012
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
City Construction Projects
500 W Fairway LN
- Case Date:
- 9/1/2022
New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.
City Construction Projects
500 W 7th ST
- Case Date:
- 2/12/2024
Why there detour sign on seventh street