closed #167192
City Construction Projects
Chase
- Case Date:
- 1/24/2019
Large pothole on 2nd where BLine crosses going east
Large pothole on 2nd where BLine crosses going east
Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.
On the lookout deck by the parking lot, there is a missing grate, so there is a leg-sized hole in the concrete. There is also a lot of broken class on the ground at the end of the lookout deck.
Why there road work at new hospital
At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.
Continual speeders on E Morningside. Someone told me our neighborhood association requested traffic calming. Please do something to keep it from being a drag strip. Definitely open to whatever you think best but multiple of us have complained for some time without changes. Thank you for your good work.
Tree limbs growing into and touching public utility lines. Several trees have not been pruned.
The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.
East 914 Atwater utility cut needs filled in
The courtyard at the 900 block of North Lindbergh drive has always flooded. The situation may have just been exacerbated even after construction is complete unless proper drainage is included before concrete is poured. I also don't really want motorcycles and motor scooters revving up all hours of the day and night outside of my apartment, and hope that this will only be for bicycles and non-motored vehicles. We now have what may become a huge mosquito breeding pool in our front yard.