City Construction Projects
- Case Date:
- 6/3/2016
The pavement at the gutter/curb/catch basin in front of my home,
1914 Hackberry Rd, has failed and there is a 12"x12" hole at the catch basin. I am surmising that the connection has failed and has washed out under the pavement.
Could you have someone check it out for us.
Thanks,
john
City Construction Projects
- Case Date:
- 7/12/2016
Citizen called, wanted to stay anonymous, reporting dangerous behavior by road crew working on Old 46. Drove toward her in her lane, head-on.
City Construction Projects
427 N Washington ST
- Case Date:
- 9/6/2016
Sidewalk has lifted due to tree roots
City Construction Projects
Indiana University Bloomington
- Case Date:
- 10/26/2016
Manhole cover removed on west side of Highland Ave. by Lambda Chi House.
City Construction Projects
- Case Date:
- 2/7/2012
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
City Construction Projects
- Case Date:
- 4/13/2012
Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction?
Thanks,
Gerry Matthews
City Construction Projects
500-520 S Walnut St
- Case Date:
- 4/18/2012
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
City Construction Projects
100-198 E Smith Ave
- Case Date:
- 8/31/2012
It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.
City Construction Projects
- Case Date:
- 10/16/2012
i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.