2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 4/11/2023
City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following:
1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.
City Construction Projects
3449 E Longview AVE
- Case Date:
- 4/9/2023
Park Ridge neighborhood: Partnered with the traffic calming bumps are stakes with reflectors to bring driver's attention to the speed bumps. Nearly all of the stakes are missing the reflectors or the reflectors are damaged. Some of the pairs of stakes have one of the stakes missing like in front of my house. (A lawn service damaged it and removed it).
So please survey and replace the missing reflectors and a couple of the missing stakes. The stakes with no reflectors appear dangerous. Like "Games of Thrones" dangerous. It was odd at the conclusion of the 2022 Morningside repaving, that the new version of traffic calming bumps was installed (thanks), but the stakes were ignored in terms of reflectors. We appreciate your attention on this item.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.
City Construction Projects
301 E 19th ST
- Case Date:
- 1/16/2023
Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.
City Construction Projects
326 W 17th ST
- Case Date:
- 1/11/2023
This sidewalk has been broken for FOR OVER 2 YEARS! And it has been reported before. It's been broken for so long you can see the damage on the satellite image you're using lmao. Pretty bad. Not just is the corner broken up into large chunks but going down the sidewalk east on 17th, the sidewalk has been worn down for years as well with no repair. One is walking on sharp pebbles instead of smooth sidewalk. Not sure what it takes for you all to actually give a shit and do something about it. But, y'know, it would be pretty cool if you did.
City Construction Projects
409 E 3rd ST
- Case Date:
- 12/5/2022
This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired
City Construction Projects
709 N Keystone CT
- Case Date:
- 11/30/2022
please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.
City Construction Projects
301 E 20th ST
- Case Date:
- 8/18/2022
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots