For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
City Construction Projects
Bloomington City Hall
- Case Date:
- 7/19/2020
Continual speeders on E Morningside. Someone told me our neighborhood association requested traffic calming. Please do something to keep it from being a drag strip. Definitely open to whatever you think best but multiple of us have complained for some time without changes. Thank you for your good work.
City Construction Projects
West 6th Street
- Case Date:
- 7/26/2020
Hello. I'm sorry I don't know side streets. ,If you go down west 6th St. Probably half way, there is three good side section of potholes. It's in areas where it's been pre filled some. Hole are 1 food deep. They have been there well over 1 year. They didn't get like the over night. I ride a Mt bike, they are very dangerous if hit
City Construction Projects
W Marquis DR
- Case Date:
- 8/26/2020
Caller said that semi's are taking w 17th to N Lismore Dr to W Marquis Dr. They are getting stuck and running over curbs. Also getting stuck and N Crescent Rd onto Fountain. Wants to know why they are routing them that way.
City Construction Projects
2701 E 3rd ST
- Case Date:
- 8/30/2020
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.
City Construction Projects
1398 W 8th ST
- Case Date:
- 9/5/2020
Huge hole in the road on the corner of 8th and Fountain.
City Construction Projects
507 E Kirkwood AVE
- Case Date:
- 9/10/2020
Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.
City Construction Projects
237 E Winslow Rd, Bloomington, IN 47401, USA
- Case Date:
- 9/11/2020
You did a great job fixing the crosswalks; thank you! We use those sidewalks frequently. However, pedestrians wishing to use the crosswalk to traverse Henderson on the south side of Winslow now face road flooding for hours/days after significant rain. The east side of the crosswalk and northbound road flood. Not only is this a problem for pedestrians, but it may present an ice hazard for vehicles in the winter months after a thaw-freeze. The crosswalk project plans available for viewing online do not seem to show a drain to collect and remove rainwater. Thank you for helping us all by addressing this!
City Construction Projects
417 S Mitchell ST
- Case Date:
- 11/8/2020
The retaining drainage Channel wall below the driveway is falling apart. This is a serious safety hazard. Additionally, tons of weeds are growing inside the channel that need removal and cleanup. This over growth is another reason why the cracks are appearing and the channel walls are falling apart. Please take action promptly. Thanks.
City Construction Projects
3251 S Walnut Springs Dr, Bloomington, IN 47401, USA
- Case Date: