City Construction Projects
100-198 E Smith Ave
- Case Date:
- 8/31/2012
It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.
City Construction Projects
1009 E Miller DR
- Case Date:
- 8/14/2024
You drove over countless potholes to install a bunch of new roadbumps! Congratulations, you just increased wear and tear and everyone's vehicles without making the roads any safer at all.
City Construction Projects
1020 S Woodlawn AVE
- Case Date:
- 6/10/2024
Why there road work sign near Bryan park pool
City Construction Projects
1101 S Rogers ST
- Case Date:
- 10/2/2024
On this property on the Allen street side, AEG left a 2ft wide and 3ft deep hole. This was months ago and the homeowner has left several messages. Also across from her property on Allen Street is an even larger whole near the sidewalk that was left by AEG.
City Construction Projects
1109 E Wylie ST
- Case Date:
- 10/21/2024
20x20 site of digging, with tarps in place and visible cones. Neighbors say some crew started this last week, then abandoned it.
I certainly did not give anyone permission to enter my property, and if this is a right of way, it does not show on the plat.
I want it remediated, repaired, and reimbursement for the costs of this destruction of private property.
I'll contact the city attorney tomorrow.
City Construction Projects
1120 W 2nd St
- Case Date:
- 4/9/2025
Why there road work at west 2nd street
City Construction Projects
1202 e 1st st and 1208 1st st
- Case Date:
- 11/6/2024
There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.
City Construction Projects
1326 S Dunn ST
- Case Date:
- 11/12/2024
The crews installing fiber have left multiple construction signs in this general vicinity from Dunn heading to the west at least one block- they have been abandoned for over a month
City Construction Projects
1416 S Liberty DR
- Case Date:
- 4/27/2024
What are all the barricades for along Liberty Drive? The start from Highway 45 and go quite a ways…
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance