open #203529
Trash
805 N Lincoln ST
- Case Date:
- 6/18/2025
Garbage scattered all over the place, trash bins lying by street.
Garbage scattered all over the place, trash bins lying by street.
Big pieces of stone wall lying on the sidewalk along Lincoln.
I live in Northwood Estates and travel daily on Kinser Pike from the bypass just to get home. After living here for 22 years, the amount of traffic has increased tremendously, especially BIG trucks. For the past 2 weeks, barrels, tape, etc have been placed there, restricting northbound turning in the left lane separately. What are the specific plans for the development and completion of this project? PLEASE complete this project before school resumes at Arlington and Bloomington High School North because in 1 afternoon I counted 28 buses going Southbound to the bypass. In advance, thank you for replying.
Boring company only has four cones to shut down the east side north bound lane of Walnut. In front of IU Credit Union
Northbound lane on Kennedy, there are 3-4 near the corner that opened up. The crew always does a great job, thanks y'all
Pothole on right edge of the southbound lane of Kinser pike, just north of the side street that leads into the back of Bloomington High School North ('Cougar Drive' I think it's called, but it isn't labeled on the map). I know the address reported here is 'Whitewood way', but the pothole is on Kinser Pike! Roughly where I've aligned the bullseye on the map.
Recent road "repair" work has left the street broken up and substantially WORSE than before the road work.
With the construction going on in the Building Trades Park homeless people are starting to hang out in the church parking lot across the street. The security patrols for the park used to check out that parking lot but have stopped since the construction has started. It would be nice if they swung through occasionally while the construction is going on.
Unable to use this sidewalk because of multiple bicycles, clothing items, and trash blocking the sidewalk. Items are falling below onto 3rd street as well which presents a hazard to passing vehicles.
With the construction going on in the Building Trades Park homeless people are starting to hang out in the church parking lot across the street. The security patrols for the park used to check out that parking lot but have stopped since the construction has started. It would be nice if they swung through occasionally while the construction is going on.