Potholes, Other Street Repair
401 S Washington ST
- Case Date:
- 6/20/2025
Pothole on south side of E Smith Ave, between S Washington and S Lincoln Street. This hole is deep and will need a fair amount of filling before patching it. Is this section of E Smith Ave between S Lincoln and S Walnut going to be repaved anytime soon ? Because it gets a lot of traffic with families picking up and dropping off students at the project school and has been patched many many times.
Thanks,
Mark Benton
Potholes, Other Street Repair
416 1/2 S Dunn St
- Case Date:
- 6/19/2025
Alley way is crumbling
Potholes, Other Street Repair
316 E University St
- Case Date:
- 6/19/2025
Is this alley abandoned? If so please forward us instructions on obtaining it. If not the pot holes are pretty gnarly they would take out a tire
Potholes, Other Street Repair
328 E University St
- Case Date:
- 6/19/2025
Alley way breaking apart at entrance
Potholes, Other Street Repair
401 1/2 E 9th ST
- Case Date:
- 6/19/2025
No parking zone blocked by weeds and foliage
Potholes, Other Street Repair
516 N Grant St
- Case Date:
- 6/19/2025
Lake Monroe jr is growing in this pothole is they could be addressed
Potholes, Other Street Repair
416 1/2 N Lincoln St
- Case Date:
- 6/19/2025
Weeds are growing on Alice street. They need repaved but the least that can be done is them sprayed for weeds.
Potholes, Other Street Repair
305 E 11th ST
- Case Date:
- 6/19/2025
Street has eroded on the side by the curb. If someone drives too close to that edge of the road, a tire could get caught in the trough.
Potholes, Other Street Repair
2532 N Skyline DR
- Case Date:
- 6/18/2025
I live in Northwood Estates and travel daily on Kinser Pike from the bypass just to get home. After living here for 22 years, the amount of traffic has increased tremendously, especially BIG trucks.
For the past 2 weeks, barrels, tape, etc have been placed there, restricting northbound turning in the left lane separately.
What are the specific plans for the development and completion of this project?
PLEASE complete this project before school resumes at Arlington and Bloomington High School North because in 1 afternoon I counted 28 buses going Southbound to the bypass.
In advance, thank you for replying.
Potholes, Other Street Repair
3407 S Kennedy DR
- Case Date:
- 6/18/2025
Northbound lane on Kennedy, there are 3-4 near the corner that opened up. The crew always does a great job, thanks y'all