Sewer Problems (Sanitary Sewers)
724 S Park AVE
- Case Date:
- 12/14/2024
Sewage was backing up into our house from the drain line, called out a plumber, and they were able to clear the blockage, but found a break in the line outside of our house due to the recent fiber optic cable installation. The external line needs repaired at this break as mud is still exposed and could cause another blockage in the line and we would also like a reimbursement for the cost of the plumbers that had to come out today.
Potholes, Other Street Repair
419 E 1st ST
- Case Date:
- 12/11/2024
Fiberoptic installation crew left an unfilled foot-sized hole in the alleyway between 415 & 419 E.1st Street just adjacent to the sidewalk.
Blocked Sidewalk
731 E. University Street
- Case Date:
- 12/11/2024
The fiber optic cable installers left the sidewalk blocked with dirt from holes they had dug. Please have them remove the soil.
City Construction Projects
- Case Date:
- 12/6/2024
Street barricades blew down two nights ago. Very dangerous in terms of projectiles hitting people and property. Also hard to see at night for thru traffic on W. 1st.,
City Construction Projects
W 1st St
- Case Date:
- 12/6/2024
Street barricades blew down two nights ago. Very dangerous in terms of projectiles hitting people and property. Also hard to see at night for thru traffic on W. 1st.,
Line of Sight
400 South Morton Street
- Case Date:
- 11/29/2024
Hello, this is in reference to #199395 that my wife submitted. it appears that they only had covered over less than half of the bad road. Our neighbors yard was also just run over the other day and somebody came back to put hay on it. Our curb also gets run over and has damaged our trees before. This is to ask if we could put some sort of guard rail or not a rail, but a guard pole to keep cars off of our properties. And to report the unfinished roadwork. Thanks for your time. I hope this voice to text isn’t too bad.
City Construction Projects
455 N College AVE
- Case Date:
- 11/27/2024
The City of Bloomington was doing road construction repairs outside of people building and broke people light pole and never came back to replace or repair!
Utility Construction Projects
455 N College AVE
- Case Date:
- 11/27/2024
The City of Bloomington was doing road construction repairs outside of my building and broke my light pole and never came back to replace or repair!
- Case Date:
- 11/26/2024
I’m writing with deep concern about the potential impact of the fiber optic project at our home at 809 S. Stull Ave.
On Nov. 25, a work crew moved heavy equipment onto our property and proceeded to operate with no advance warning or permission. We are currently out of town for the holiday, and a neighbor took the attached photo. We are astounded not only at the trespass, but also at the potential damage. We just spent significant money and time purchasing and planting bushes and several trees in the area where the crew was working. We are concerned also about our recently laid sewer line, and about the drilling of holes (see photo) directly next to a very large pin oak tree. We won’t be home and able to assess any damage ourselves until Dec. 8 but are anxious to hear from you ASAP about 1) recourse if there is damage to our property, and 2) city policy regarding work crews entering private property without warning or authorization.
Blocked Sidewalk
1211a W 17th St
- Case Date:
- 11/24/2024
Solar looking spotlight placed in the right of way tree plot. How is this allowed? ROW agreement? Please remove