Traffic Signals
2nd and Adams
- Case Date:
- 4/27/2025
The traffic light is longer for the traffic on Adam’s Street vs the traffic on 2nd Street causing a back up all. The timing should be flipped so the green light is longer for the traffic on 2nd Street.
Traffic Related Complaints
315 W Dodds ST
- Case Date:
- 4/27/2025
There is a hole in the road. It’s a hazard for motorists & bicyclists.
Potholes, Other Street Repair
Rogers & Dixie
- Case Date:
- 4/26/2025
Pothole on Dixie just west of Rogers
Potholes, Other Street Repair
Rogers & Dixie
- Case Date:
- 4/26/2025
Pothole on Dixie just west of Rogers
Potholes, Other Street Repair
804 S Rogers ST
- Case Date:
- 4/26/2025
Pothole
Potholes, Other Street Repair
605 W 1st St
- Case Date:
- 4/26/2025
Other: Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges. W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.
Potholes, Other Street Repair
320 W 8th St #113
- Case Date:
- 4/26/2025
Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges.
W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.
Street Lights
2855 N Walnut ST
- Case Date:
- 4/25/2025
Street light neck broken.
Traffic Signals
275 E Winslow RD
- Case Date:
- 4/25/2025
Light regularly does not change to green for traffic going south even with multiple cars sitting it will cycle through multiple times unless someone needs to turn left.
- Case Date:
- 4/25/2025
Outdoor clock is not working.