Potholes, Other Street Repair
1020 N Monroe ST
- Case Date:
- 3/4/2025
There is construction at the corner of W 14th and N Monroe, and the lanes are shifted slightly west as a result. The southbound lane, near the temporary construction barriers, has a series of very deep potholes that are unavoidable due to the cones dividing the traffic lanes.
Potholes, Other Street Repair
100 E 3rd St
- Case Date:
- 3/3/2025
Intersection of 3rd st and s Washington st. Several in north lane going west on 3rd.
Sidewalk & Curb Complaints
106 E 2nd ST
- Case Date:
- 3/3/2025
Sidewalk (some areas are brick & some are cement) on this stretch could use some sanding to smooth over some areas where they are a bit uneven and a tripping hazard.
Potholes, Other Street Repair
323 E 11th ST
- Case Date:
- 3/3/2025
Intersection of east 11th st and north grant st
Potholes, Other Street Repair
1206 N Lincoln ST
- Case Date:
- 3/3/2025
Just North of intersection of 16th and Lincoln. Multiple others going North on Lincoln to 17th street
Potholes, Other Street Repair
215 E 2nd ST
- Case Date:
- 3/2/2025
There is a pothole on E 2nd St before Lincoln St.
Potholes, Other Street Repair
Kinser Pike and West Skyline Drive
- Case Date:
- 3/1/2025
Several shallow potholes on W Skyline Dr at the stop sign by Kinser Pike.
Potholes, Other Street Repair
10th St & Woodlawn
- Case Date:
- 3/1/2025
There are two pothole in this area. By the light at the intersection of 10th and Woodlawn.
Potholes, Other Street Repair
900 W Allen ST
- Case Date:
- 3/1/2025
Traffic light signal cables exposed at Patterson and Allen
Street & Traffic Signs
1017 S Rogers ST
- Case Date:
- 2/28/2025
The sign in the middle of the Allen-Rogers intersection (right turn except bikes) has been knocked down.