uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (121)

open #203857

City Construction Projects

901 W 1st ST

Case Date:
6/30/2025

Cable hanging down on sidewalk near corner of W. 1st and WylieEuclid. Duke came and said not theirs prob phone or internet cable. Checked with one internet company (Comcast) and 14 day wait. The cable is on the sidewalk and a hazard in many ways. It seems to be possible related to the movement and placement of construction poles during demos and renovations to the East.

closed #202952

City Construction Projects

414 E Cottage Grove AVE

Case Date:
5/26/2025

Cavity forming alongside water meter in ROW close to SW corner of lot.

closed #202737

City Construction Projects

Hillside Dr

Case Date:
5/16/2025

Why there road work on that intersection

closed #202690

City Construction Projects

1107 S Washington ST

Case Date:
5/14/2025

Gigabit workers left big utility mess —hazardous! I reported to them in February & contacted them several times but no repair—

closed #202435

City Construction Projects

Case Date:
5/2/2025

Construction equipment is parked on the sidewalk. The city would not let businesses park this equipment on the street, blocking access for cars. Why do you allow them to block access for pedestrians? Thank you. West 2nd street just east of eucild street northwest of street

closed #201967

City Construction Projects

1120 W 2nd St

Case Date:
4/9/2025

Why there road work at west 2nd street

open #201772

City Construction Projects

723 W Allen ST

Case Date:
3/29/2025

Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown

closed #201692

City Construction Projects

Case Date:
3/24/2025

Debris from construction left on either side of 11th street and Indiana ave. Needs cleaned up

closed #201608

City Construction Projects

Case Date:
3/18/2025

Construction for hopewell neighborhood: driving west between rogers and walker. Today is the 3rd time there is a team working without a flagger directing traffic in the street. The work is being done with a bobcat of some kind blocking one lane immediately before a hill, where you cannot see oncoming traffic. I’ve called twice about this already. Thank you!

closed #199774

City Construction Projects

512 E University ST

Case Date:
12/27/2024

Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in people front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from