closed #203514
Potholes, Other Street Repair
706 N Dunn ST
- Case Date:
- 6/18/2025
Recent road "repair" work has left the street broken up and substantially WORSE than before the road work.
Recent road "repair" work has left the street broken up and substantially WORSE than before the road work.
With the construction going on in the Building Trades Park homeless people are starting to hang out in the church parking lot across the street. The security patrols for the park used to check out that parking lot but have stopped since the construction has started. It would be nice if they swung through occasionally while the construction is going on.
Unable to use this sidewalk because of multiple bicycles, clothing items, and trash blocking the sidewalk. Items are falling below onto 3rd street as well which presents a hazard to passing vehicles.
With the construction going on in the Building Trades Park homeless people are starting to hang out in the church parking lot across the street. The security patrols for the park used to check out that parking lot but have stopped since the construction has started. It would be nice if they swung through occasionally while the construction is going on.
There was an auto accident a couple of hours ago and all of the debris is still in the intersection causing drivers to unsafely navigate the intersection from multiple directions.
Blocking sidewalk
Drugs and dog belle being raped by tim
Drugs and dog belle being raped by tim
Drugs and dog belle being raped by tim
Drugs and dog belle being raped by tim